PTC Beaver County – Bridge Replacements
Project Description
McCrossin Foundations was subcontracted to install temporary support of excavation at multiple locations for the demolition and installation of two new railroad bridges over the Pennsylvania Turnpike. Over 7,000 square feet of temporary excavation support was installed using drilled soldier beams and lagging, tie-rods, rock bolts and mesh.